Reducing volume or blocking pipes, tanks or other circular orifices for purging, routine maintenance or to prevent the entry of foreign bodies can be much easier with an Inflatable Pipestopper.

A range of standard and non-standard Inflatable Stoppers for tanks, chambers, tubes, pipes, pipework fabrications and ductwork are available from the Pipestoppers Division of Huntingdon Fusion Techniques HFT.

Recently, three extra large Inflatable Stoppers were manufactured for a special project. Georgia Gascoyne, CEO at Huntingdon Fusion Techniques HFT said: “The two 84” and one 90” were ordered for a project where large diameter pipes inside a turbo generator needed sealing. Within two weeks we were able to manufacture these special Inflatable Stoppers, which helped make the project a success.”

These versatile Inflatable Stoppers are used to service a wide variety of industrial applications. As “overnight stoppers” they provide a strong barrier in pipeline activities, to prevent foreign bodies entering the line during downtime.

In machining applications, they can be inserted below a horizontal flange on a vertical pipe, to prevent machining fluid, swarf and tools from falling into expensive machinery such as pumps and turbines etc.

When welding large tanks and vessels, stoppers inflated with air can dramatically reduce the volume inside, so that the argon purging process takes little time and uses the minimum of expensive gas. The stoppers pay for themselves in one weld and can be used multiple times.

Other applications include leak testing of pipework systems, whether commercial, domestic or industrial, on site thermoforming of bends in plastic materials and fibre-optic construction projects.

All Inflatable Stoppers are manufactured with a strong internal inflatable bag covered in waterproof sewn polyurethane coated nylon for low friction and to prevent the production of static electricity or accidental sparking.

Inflatable Stoppers are particularly useful when one or more can be inserted into a small opening close to a work location, rather than at the end of the pipe, tank or vessel. No high-pressure equipment is needed for inflation.

The standard range of Inflatable Stoppers are available for immediate delivery in cylindrical or spherical formats with sizes ranging from 1 to 96” (25 to 2440 mm). 

Company Info

Latest News

Tags
Inspection
Projects

Montreal-based consultancy completes inspection and leak detection of six 1,200-mm steel watermains and one 1,500-mm PCCP main in Montreal

ROV command centre.

Since September 2013, GAME Consultants has been paving the way for the next generation of watermain condition assessment tools by using existing tools and working to improve the results with every project. The company’s position is to equip itself with a wide range of tools designed exclusively for use in watermains.

Read More

Tags
Inspection

Using technology for a higher purpose

Andrew Topf, Editor

The technologies for inspecting sewer, storm water and watermain pipes are well established and get deployed with confidence by municipalities across Canada when it comes to pipeline rehabilitation or replacement work.

Read More

Tags
Water & Sewer
Projects

A tale of two manhole fixes

AP/M Permaform rehabilitate failing manholes and sewers using the Permacast and CentriPipe systems.

Canadian contractors are cost effectively rehabilitating failing manholes and sewers without excavation or barrel replacement using the Permacast and CentriPipe systems developed by AP/M Permaform (AP/M) and distributed by Martech, Inc. Edmonton-based OSCO Mudjacking & Shotcreting Ltd. applied Permacast on two manhole projects with widely varying challenges:

  • A new 9-metre manhole installed as part of Edmonton’s massive project converting the QE II Highway and 41 Avenue SW connection to a grade-separated interchange.
  • Six failing manholes in remote Carmacks, a Yukon village.

Read More

Tags
Industry News

The Robbins Company announces appointment of Joe Lechner to SBU Sales

Joe Lechner, SBU Sales Manager.

The Robbins Company has announced the appointment of Joe Lechner to the role of Small Boring Unit (SBU) Sales Manager. With over 18 years of industry experience, the role is a natural career progression for Lechner. It brings him back to his early roots of working with SBUs, while more recently he worked with TBMs. Lechner can continue his success with the company in this new capacity with the trenchless division.

Read More

Get our newsletter
(it's Free)

Insight delivered weekly to your inbox

it's free!
Canadian Underground Infrastructure
Tags
Projects
Tunneling

Robbins achieves another breakthrough in Bangalore

EPB Kaveri in the launch pit at Chickpet in March 2015

On June 8, 2016, one of two 6.4 m (21.0 ft) diameter mixed-face EPB machines broke through at Namma Metro. After being launched in March 2015, the TBM named Kaveri made its way through its difficult 750 meter (2,460 ft.) drive from Chickpet to Majestic. Sister machine Krishna, launched in December 2015 is not far behind, and is expected to break through in approximately two months.

Read More

Tags
Utility Locating and Mapping

GSSI’s new 350 HS Antenna uses HyperStacking technology to improve performance while meeting GPR emissions limits

350 HS Antenna.

GSSI has announced its 350 HS Antenna, which greatly improves the depth and data resolution performance of traditional real time sampling technologies. The 350 HS is designed for use with new digital HyperStacking technology, which allows users to see deeper targets and operate in conditions considered too “noisy” for conventional systems. Easily configurable, the 350 HS antenna is ideal for archaeology, geophysics, and utility locating applications.

Read More

Tags
Industry News

Microsoft and Facebook to build new subsea cable across the Atlantic Ocean

MAREA will be the highest-capacity subsea cable to ever cross the Atlantic – eight fiber pairs and an initial estimated design capacity of 160Tbps.

Microsoft and Facebook announced an agreement to build a new, state-of-the-art subsea cable across the Atlantic. The new "MAREA" cable will help meet the growing customer demand for high speed, reliable connections for cloud and online services for Microsoft, Facebook and their customers. The parties have cleared conditions to go Contract-In-Force (CIF) with their plans, and construction of the cable will commence in August 2016 with completion expected in October 2017.

Read More

Tags
Industry News
Projects

Completion of trackwork for the Toronto-York Spadina Subway extension

A special event was held to celebrate the completion of trackwork in the new Toronto-York Spadina Subway Extension (TYSSE) tunnels and stations where a total of 17.4 kilometres of track and four sections of special track have been installed. Dignitaries walked down into the station to track level where they participated in a ceremonial tapping in of the last clips that hold the rails in place.

Read More

Tags
Industry News

Rick Gage of LMK Technologies named to MSTT board of directors

Rick Gage

Rick Gage, Vice President of Sales at LMK Technologies, has been named to the board of directors for the Midwest Society for Trenchless Technology (MSTT). The non-profit organization was established in 1998 to promote trenchless technology education and its public benefits in Illinois, Indiana, Iowa, Kentucky, Michigan, Minnesota, Missouri, Ohio and Wisconsin. “MSTT is dedicated to advancing the science and practice of trenchless technology through training, education and field demonstrations,” says Leonard Ingram, MSTT executive director. “Rick will be a wonderful advocate for our society, helping to spread the word and increase the visibility of this eco-friendly and cost-effective approach to repairing broken, cracked or worn out lateral sanitary sewer lines.” “Many municipalities and industry professionals are still unaware of the value afforded through the latest ‘no dig’ technologies,” adds Gage. “This includes the ability to easily and cleanly repair underground sanitary sewer lines without digging up driveways, landscapes, porches and other outdoor structures. It is truly a pleasure to discuss and promote the benefits of a technology that offers so many environmental and cost-saving advantages.”

Read More

Get our newsletter
(it's Free)

Insight delivered weekly to your inbox

it's free!
Canadian Underground Infrastructure
Tags
Water & Sewer

Super Products introduces sewer cleaner wastewater recycling system

Camel 1200 sewer cleaner.

Available exclusively on the Camel 1200 sewer cleaner, Super Products LLC’s wastewater recycling system features a six-stage water filtration process that enables effective sewer cleaning action without the need for fresh water. And this capability can translate into substantial water, time and money saves for municipalities and sewer contractors.

Read More

Tags
Underground Utilities & Pipelines
Industry News

Subsite Electronics supports AEM utility awareness campaign

Subsite Electronics stresses the importance of Underground Awareness in all underground construction jobs.

Subsite Electronics is helping put a focus on safety in underground utility jobsites with its support for the Association of Equipment Manufacturers’ (AEM) Utility Awareness Campaign. The AEM campaign aims to promote safety best practices and debunk common myths associated with underground utility installations.

Read More

Tags
Stormwater

Quebec City storm water quelled with underground chamber system


The storm water control systems for the Centre were designed by SNC-Lavalin.

 – Photo courtesy of SNC-Lavalin.

Engineers from SNC-Lavalin found the way to meet stringent storm water drainage regulations for a portion of the new Centre Vidéotron site by designing two underground retention systems. Managing storm water runoff is a prime concern for Quebec City because the area is prone to flooding. The multipurpose, 18,000-seat arena, spread out over some 7.2 hectares (18 acres), opened in September 2015.

Read More

Tags
Stormwater

Precast concrete box sections specified for storm water detention structure

The detention tank is placed below the P1 level of the parking structure, to accommodate the large volume of storm water.

Precast concrete box sections were specified for an underground storm water detention tank to enable the construction of the Humber Mews Townhomes project on Evans Avenue in Toronto. The system was selected because it could reduce the total peak runoff being discharged from the site during all storm events. Using precast units would reduce construction costs and time. Other pre-manufactured solutions were considered, nevertheless, a precast system was selected as the preferred option. The structure met the service life requirements through the proven durability of precast concrete.

Read More